Chase Field Suite Renovations / Phoenix, AZ
How do you boost sales and revitalize an old structure to improve fan experience?
Renovations within Chase Field were completed in multiple phases due to the need to keep the facility operational and to work around scheduled off-season events. The project included:
- Renovation of 60 suites (including owner’s suite)
- Demolition of 4 existing suites that were converted into a Stand Up Lounge
- Demolition of 4 existing suites that were converted into an “All-You-Can-Eat” Lounge
- Renovation and upgrades to the scoreboard control rooms and replacement of the existing Sony Jumbotron with a 145’WX60’H HD Daktronics Video Board
- Renovation of 60 suites (including owner’s suite)
- Demolition of 4 existing suites that were converted into a Stand Up Lounge
- Demolition of 4 existing suites that were converted into an “All-You-Can-Eat” Lounge
- Renovation and upgrades to the scoreboard control rooms and replacement of the existing Sony Jumbotron with a 145’WX60’H HD Daktronics Video Board
Facts And Figures
Delivery Methods
Construction Manager at Risk
Related
I recently completed an evaluation of their pre-construction services at Chase Field and gave them the highest rating I’ve ever given a contractor in my 40 years in the design and construction business in federal, state and county government.