confidential-energy-storage-project
- Facts and Figures
-
200 MW / 200 MWh Energy Storage
138kV Substation
Completed August 2021
- Delivery Method
- EPC
200 MW / 200 MWh Energy Storage
138kV Substation
Completed August 2021
Mortenson was chosen to engineer, procure, and construct (EPC) this standalone 200MW/200MWh battery storage facility utilizing lithium-ion phosphate batteries housed in battery enclosures.
In addition, the team is also the EPC partner for a 138kV substation interconnecting the battery system to the power grid.