Confidential 200MW Energy Storage Construction

What does a battery storage facility utilizing lithium-ion phosphate batteries look like?

confidential-energy-storage-project

Facts and Figures

200 MW / 200 MWh Energy Storage

138kV Substation

Completed August 2021

Delivery Method
EPC

Mortenson was chosen to engineer, procure, and construct (EPC) this standalone 200MW/200MWh battery storage facility utilizing lithium-ion phosphate batteries housed in battery enclosures.

In addition, the team is also the EPC partner for a 138kV substation interconnecting the battery system to the power grid.